Structural Steel, Pre-Cast and
Tilt-Wall Concrete Erection
  • Industrial Pipe Racks & Unit Structures
  • Manufacturing Facilities
  • Commercial Buildings
Structural Sidings
  • Unit Structures
  • Commercial/Industrial Facilities
  • Retro Fit Roofing Systems
Pre-Fabricated Metal Building Erection
  • Agricultural
  • Public Facilities
  • Industrial Use
  • Commercial Use
  • Aircraft Facilities
  • Automotive Facilities
  • Recreational Use

    Bradken Foundry - Amite, LA

TWA supplied all labor and equipment to erect a 155’x160’ pre-engineered metal building with a 50’ eave height fabricated by Butler. This project was an addition to their existing foundry and consisted of several overhead cranes, large framed openings and several rooftop exhaust fans and intake louvers.
    SNF Flopam Plaquemine Polymer Plant

At the clients request TWA Erectors supplied all building materials and labor to construct a complete building shell for 8 structures totaling over 230,000 sf. With a rising river, tight schedule an unfavorable site conditions TWA Erectors was able to work in harmony with the owner and other site contractors to provide a complete building shell for the owner to install their proprietary process systems. TWA supplied a metal building package engineered and fabricated by Nucor Building Systems to meet the clients request for a 140 wind rated structure which consisted of 2” insulated wall panels for all buildings. Other services provided under this contract were impact/wind-rated windows and doors, stucco metal panels for office buildings, awnings, masonry and concrete work at all mezzanines.

Worked as a subcontractor for S&B Engineers on this project at Shell Refinery in Port Allen, LA.
  • Installation of wall girts, roof purlins,
    R-panel siding and standing seam roof
    on four (4) unit structures.
  • Furnished and erected shelter canopy for transformer, installed sheeting at truck
    loading station
      Kinder Morgan Drumming Facility

Worked as a subcontractor for Group Industries constructing a new warehouse facility.
  • Erection of a 140,000 sq.ft.
    pre-engineered metal building.

Worked as a subcontractor for Shaw on this project located in St. Gabriel, LA.
  • Installation of structural siding,
    standing seam roof and bar joists.

Worked as a subcontractor for multiple general contractors (James Construction Group, Group Industries, Shaw Constructors, Turner Industries) for the Plaquemine, La expansion.
  • Erection of eight (8) pre-engineered metal buildings totaling 160,000 sq.ft.
  • Installation of roof and wall sheeting on four (4) unit structures totaling over 200,000 sq.ft.
    Misc Commercial Buildings

Various projects completed by TWA Erectors

©2009 TWA Erectors, LLC